Laserfiche WebLink
Based on the information submitted, staff has recalculated the Final Reclamation Costs <br />associated with this TR. Please find a copy of the estimate enclosed. Staff calculations <br />estimate the required reclamation bond for this TR will be $41,000.00. This is an <br />increase of $24,000.00 over the current bond now in place. The correct bond will need to <br />be accepted by the Division prior to any disturbance outside of the current 10 acres of <br />disturbance or 60 days from approval, which ever comes first. <br />If you need additional information, please contact me at the Division of Minerals and <br />Geology, Grand Junction Field Office, 101 S. 3rd St., Suite 301, Grand Junction, Colorado <br />81501, telephone no. 970.241.1 1 17. <br />Sincerely, <br />G. Russell Means <br />Environmental Protection Specialist <br />Cc: Carl Mount, Senior Environmental Protection Specialist, DMG /Denver (e-mail) <br />Cc: Art Beavers, Beavers Construction, Operator. <br />