Laserfiche WebLink
'Phase Nb Weekly Summary No. 16 Page 4 003-2203 <br />Golder monitored and observed the removal of DCF in the Phase IVb /Phase III tie-in, and the <br />Phase I / ]Va /IVb tie-in area. Golder CQA monitors verified width of lap required and mazked the <br />existing liner damage for future tie-in activities and repairs. <br />Laborator~sts <br />Golder obtained no QA samples of earthwork materials during this reporting period. <br />Meetings <br />CC&V held a Weekly Contractors meeting on May 6. Items discussed included Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on May li, 2003 at <br />10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment A. <br />Sincerely, <br />~/ <br />Ron DiDonato <br />Resident CQA Monitor <br />Phase R'b 16 May0.Maylq 200i.doc Golder Associates Inc. <br />