My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-16_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-05-16_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:53 PM
Creation date
11/21/2007 9:28:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
5/16/2003
Doc Name
Weekly Construction Report
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i ~ ~~ <br />,~~. <br />Golder <br />1~SSOClc'~teS <br />May 13, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />RECEoVED <br />Golder Associates Inc. MAY ~ 6 1003 <br />44 Union Boulevard, Suite 3081V1S10n of Minerals and Geology <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 16: May 4 through May 10, 2003 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Deaz Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of May 4 <br />through May 10, 2003. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 23° F to 32° F, and highs ranged from 34° F to 57° F. Snow was recorded <br />on May 4 through May 6, and May 10. Weather observations were made on seven days of this <br />seven-day reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVb and <br />c construction. Ames conducted Phase IVb and c constrrction activities on six days of this seven-day <br />reporting period (May 5 through May 10, 2003). Poly-Flex conducted Phase IVb construction activities <br />on six days of this seven-day reporting period (May 4 through May 4, 2003). <br />Phase IVb <br />Ames continued excavation of the upper Phase IVb PSSA geomembrane primary anchor trench and the <br />lower secondary anchor trench, excavating approximately 300 feet of northern primary anchor trench, <br />and approximately 250 feet of south ore slope secondary anchor trench. <br />Ames completed placement of Structural Fill (SF) in the Phase IVb area, placing SF on the Substation <br />Hill south slopes. Ames continued slope re-contouring and re-compaction on Substation Hill and <br />Raven Hill, north and upslope of the PSSA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.