My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-05-02_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
1996-05-02_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 9:27:02 AM
Creation date
11/21/2007 9:27:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
5/2/1996
Doc Name
CRIPPLE CREEK & VICTOR GOLD CO EXPANDED AREA FOR SOIL LINER FILL SUBMISSION OF SPECIFICATIONS & TEST
Type & Sequence
TR21
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC&V Gold Mng . ID : APR 30 '96 20 :28 No .030 P .01 <br /> C C Cripple Creek And Victor Gold Mining Company <br /> f� A jow venture-MCI&Peek Mining CQMP*nr,AID yga <br /> Operations Office Englewood Office <br /> LX. P.O. Box 191,2755 Slate Highway 87 P.O. Box 5078. 5251 DTC Parkway,Suite 700 <br /> victor. CO 60800 Englowood, CO 80155 <br /> (719)689.2977•FAX (719)689-3254 (303)889-0700• FAX(303)689.0707 <br /> April 30, 1996 <br /> SENT CERTIFIED RETURN RECEIPT REQUESTED <br /> Mr. Berhan Kcffelcw, <br /> Environmental Protection Specialist <br /> Colorado Department of Natural Resources <br /> Division of Mines and Geology <br /> Office of Mined land Reclamation <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> Reference: Cresson Project: Permit M-80-2441 Cxpanded Area For Soil Liner Fill <br /> Submission Of Specifications and Test Results. <br /> Dear Mr. Keffelew; <br /> In order that the Cripple Creek & Victor Gold Mining Company ("CC&V") may be assured of <br /> adequate clay other than the Ironclad material for 1996 construction, CC&V submitted, as part <br /> of its technical revisions dated January 9, 1996, an additional material specification for Soil <br /> Liner Fill. This imatcrial would come front an area nc-.r the primary crusher. CC&V now <br /> wishes to add a slightly different material classification based oil the characterization of an <br /> additional native clay area in approximately the sarne area. <br /> In 1996, CC&V expanded life exploration and testing for Soil Liner Fill to an additional area <br /> of fife same general type of material as the "Area 2" material described, tested, and reported in <br /> our letter of January 9, 1996. In the process, we have identified an area with better <br /> characteristics in terms of accessibility for extraction. The grain-size gradation met by this <br /> material, upon screening or oversize, differs slightly from the two Soil Liner Fill gradations <br /> currently in the Technical Specifications (that for the Ironclad material and that added in the <br /> January 9, 1996 technical revision for "Area 2" material). Therefore, CC&V wishes to submit <br /> an additional gradation specification for Soil Liner Fill that may then be the principal gradation <br /> for 1996 construction, provided adequate material is found in the area. <br /> The attached letter from Golder Associates reports the results of the testing (Attachment 1). <br /> Grain size distributions were developed, permeability tests were performed, and the cation <br /> exchange test was conducted. in addition, the interface shear test with Drain Cover Fill was <br /> conducted using 80 mil textured Linear Low Density Polyethylene ("T.I.DPE") between the Soil <br /> Liner Fill and the Drain Cover Fill, with the textured-side of the LLDPE facing the Soil Liner <br /> Fill. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.