Laserfiche WebLink
<br />Cripple Creek & Victor Gold Mining Company December 8, 2003 <br />Mr. Ron Roberts -3- 003-2203 <br />Attachments: <br />' Table 1 - Summary of Earthworks Material Specification <br />Table 2 - Earthworks CQA Test Summary and Testing Frequency - Phase N 2003 Containment <br />' Liner Extension <br />Table 3 - CQA Laboratory Test Summary -Structural Fill <br />Table 4 - CQA Laboratory Test Summary -Pipe Bedding Material <br />' Table 5 - CQA Laboratory Test Summary -Soil Liner Fill <br />Table 6 - CQA Laboratory Test Summary -Drain Cover Fill <br />Table 7 - Field Density and Moisture Content Test Summary - Phase N 2003 Containment Liner <br />Extension Soil Liner Fill <br />' Table 8 - Soil Liner Fill -Depth Verification Summary <br />Figure 1 -Containment Liner Extension As-Built Top of Liner Grading <br />Figure 2 -Containment Liner Extension Geomembrane As-Built Drawing <br />Attachment A -Earthworks Testing Results <br />Attachment B -Geomembrane Installation Observation and Test Results <br />Attachment C - Subgrade Acceptance Forms, Geomembrane Certifications, Resin Certifications, <br />1 Equipment Calibrations, Golder Staff Schedule, and Poly-flex Resumes <br />JFL/Ijd <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />'. <br />' 1:\OOR20J\0000\CQA-MR1103\003220J.0400.09143Rep.doc GOlder ASSOCiates <br />