My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-03-23_REVISION - M1999062
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999062
>
2007-03-23_REVISION - M1999062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:44 AM
Creation date
11/21/2007 9:12:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999062
IBM Index Class Name
Revision
Doc Date
3/23/2007
Doc Name
Cost Estimate
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br /> BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 001 State :Colorado PermiUjob# :M-1999-062 <br />Date : 03/22/2007 County :Ladmer Abbreviation :none <br />User : ESC Site :Indio Red #1 And #2 Filename :M062-001 <br />Agency or organization name :DRMS <br />Permit or other job action :Surety Increase <br />Task descdption : Backfi118 Grade Quarries 1 8 2 <br />Basic machine :Cat D8R Series !I - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Cost Breakdown : Ownership cosUhour <br />Operating cosVhour <br />Ripper op. cosUhour <br />Operator cosUhour <br />Total unit cosUhour <br />Utilization °h <br />$58.24 NA <br />$73.75 100 <br />$1.71 25 <br />$32.78 NA <br />Horsepower: 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> <br /> <br /> <br /> <br />$166.49 TotalfleetcosUhour <br />$168.49 <br />Loose <br />1.215 volume : 6,075 LCY <br /> <br />~ Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.00 (Cat HB <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshilUda <br />Spoil pile ; 0.80 ((nd-rt) <br />Push gradient ; 1.00 (Cat HB <br />Altitude ; 1.00 (Cat HB, <br />Matedal weight ; 0.70 (Cat HB, <br />81ade type ; 1.00 (S/SU/U <br />Net correction : 0.35 <br /> <br />Adjusted unit production : 220.08 LCY/hr <br />Adjusted fleet production : 220.08 LCY/hr <br />Total job time : 27.80 Hours <br />Total job cost : $4,596 <br />Source of estimated volume :DRMS Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 150 feet <br />Unadjusted howdy production : 634.3 LCYIhr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 0.00 % ({ <br />Average site altitude : 6,500 feet <br />Material weight : 3,300 Ibs/LCY <br />Weight description : <br />Decomoosed rock - 75% Rock. 25% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.756 /LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.