My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-01-16_REVISION - M1986061
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986061
>
2004-01-16_REVISION - M1986061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:02 PM
Creation date
11/21/2007 9:11:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986061
IBM Index Class Name
Revision
Doc Date
1/16/2004
Doc Name
Amendment Application
From
Oldcastle SW Group Inc dba Four Corners Materials
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Valley Fill Area #2 <br />Valley Fill Area # 2 will utilize the same Grass Lined and Rip-Rap Lined channel designs as Val- <br />leyFill Area # 1. The grass lined channel will be used along the top of the bench. The grouted <br />rip-rap channel will be placed on the highwall cut area to transition the flow to the bench and <br />along the slope of the valley fill material. Boulder energy dissipaters will be used at the end of <br />the fill slope channel. <br />1'he channel locations can be seen on Map C-2. The various channel designs can be seen on Map <br />C-3. <br />5. Mine Facilities and Operation <br />The site will consist of a portable crushing and screening plant, portable stacker conveyors, and a <br />portable asphalt plant. The plant will have its own generators and portable #2 diesel tank of 4000 <br />gallon size. This tank will have its own secondary containment built under the steel tank. The <br />crush/screen plant will be brought to the site fora 18-26 weeks intermittently throughout the year. <br />The screened material will then be sold throughout the yeaz. <br />The site vrill also have an asphalt plant. The plant ~i~Jl have its ovm portable tank for hot mix as <br />well as #2 diesel for the generator. These tanks aze estimated at 23,000 gallons of hot mix and 500 <br />gallons of #2 diesel each. Both of these tanks will also have secondary containment within the por- <br />table plant. An LP tank of 17,000 gallons will also be used to heat the material. No concrete plant <br />is planned for this site. <br />Due to the high production rates a fuel farm will be need for the site. The fuel farm will have sec- <br />ondary containment for all tanks housed within the faun. The expected tanks will be two 10,000 <br />gallon tanks of diesel and approximately two 500 gallon tanks of gas or other fuels. <br />The site will have a truck scale, quality control lab trailer, and a scale shack. No outdoor lighting <br />and no other structures are planned. Portable toilets will be used for employees. No night activity <br />is scheduled for the operation. All structures on site are shown on Map C-2. These are relative <br />Cugnini 12/03 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.