Laserfiche WebLink
South Pit Tonnage per Area <br />Area Acres Tons Life (years <br />1 7.29 408,330 1. <br />2 6.48 459,372 1.1 <br />3 8.22 517,974 1. <br />4 6.05 372,412 0. <br />5 5.03 373 085 0. <br />otal 33.07 2131173 5.1 <br />Table D-5 , <br />Staging Area <br />The staging azea has been mined to the elevation shown on map C-1 in the Spring of 2003. Test <br />holes dug in the Fall of 2003 indicate reserves were left below the bench. These reserves will be <br />mined on an "as need basis." Facilities i~rill be setup in this area throughout Ule mine life, how- <br />ever during the mine life the reserves will be taken in this area based on demand and actual facil- <br />ity placement. Approximately, 200,000 sellable tons aze expected to be mined from this area <br />This tonnage contributes to the mine life by 9 months. <br />2. Mining Timetable <br />The following timetable is a best estimate of the sequence of operations for the life of the mine <br />and is based on mining and selling 261,000 tons of total product per year (this is less than the per- <br />mit maximum rate of 360,000 tons/yr but is an expected average?: <br />Cugnini 12/03 4 <br />