My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-20_REVISION - M1978080
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978080
>
2004-10-20_REVISION - M1978080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:15:31 PM
Creation date
11/21/2007 9:03:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978080
IBM Index Class Name
Revision
Doc Date
10/20/2004
Doc Name
Amendment Application
From
Lincoln County
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lincoln County <br />Permit Application No. 04LI1172F Colorado Department of Public Health and Environment <br />APEN Required/Permit Exempt Air Pollution Control Division <br />A Revised Air Pollutant Emission Notice (APEN) shall be filed: (Reference: Regulation No. 3, Part A, <br />Section II.C.) <br />a. Annually whenever a significant increase in emissions occurs as follows: <br />For any criteria pollutant: <br />For sources emitting less than 100 tons per year, a change in actual emissions of five <br />tons per year or more, above the level reported on the last APEN submitted; or <br />b. Whenever there is a change in the owner or operator of any facility,process, or activity; <br />or <br />c. Whenever new control equipment is installed, or whenever a different type of control <br />equipment replaces an existing type of control equipment; or <br />d. Whenever a permit limitation must be modified; or <br />e. No later than 30 days before the ezsting APEN expires. The five-year term for this APEN <br />expires on 09/02109. <br />Any changes with respect to the original submittal that would result in an increase in production above <br />70,000 tons per year automatically nullifies this exemption. Before actually making any such change, you <br />must apply to the Division for a construction permit based on the anticipated change. A permit must be <br />obtained BEFORE implementing the change. <br />This exemption is for mining related activities only. Any process equipment (i.e. crushers, screens, etc.} <br />located at this site must have a separate permit from the Division. <br />Sincerely, <br />Catherine Flanders <br />Permit Engineer <br />Stationary Sources Program <br />Air Pollution Control Division <br />AIRS ID: 073/0070/001 Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.