My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-05-31_REVISION - M1978056 (10)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978056
>
2006-05-31_REVISION - M1978056 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:02:53 PM
Creation date
11/21/2007 9:03:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978056
IBM Index Class Name
Revision
Doc Date
5/31/2006
Doc Name
Adequacy Response
From
Varra Companies Inc.
To
DMG
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> <br />Vyen~a~d~ a//ve~~i 0~~pe~~ratlon- Du~hem Pft <br />`.'. w.°l. M~411OMI <br />P~e3 <br />-dry density; <br />-direct shear strerx,)th; <br />-grein size distribution; <br />-6quid Emit; and <br />-plastlcity index. <br />Feld observations and gradation test results indicate the majority of the bank material is <br />sand with gravel with a dry bulk density of 115 pounds per cubic foot The internal angel of <br />friction was cakxilatad to be 49 degrees. The residual and peak bn was reported at <br />0 and 450 pounds per square foot The moisture content varied between 7.5 and 11.5%. A <br />cohesion of 0 was used in sbpe failure calculatlons. <br />The software program SLOPE/W and SEEP/W was used to estlmate statc bank failure <br />safety factors. Mine pit and river flood conditions with rapid drewdown scenarios were <br />simulated as well. These simulations were performed by CTL Thompson. The profile of <br />section 43+40 as shown on Piste C15 (Attachment A) was used to predict safety factors. <br />This section was chosen as ft identifies the presence of a productlon gas transmissi~ line <br />and has substantlal pit side bank height. The soil conditions were replicated to match the <br />soil profile of soil boring B-6. Sbpe failure analyses were ran for the river and mine pit <br />sides of the bank The modified Janbu method was used as it provided more conservatBre <br />safety factors. <br />The river side stability results indicate factors of safety between 4.05 and 5.66. Simulations <br />for static, pseudo static, mine pd flood and river rapid drewdown were performed. The <br />same simulations were run for the pit side of the bank with pkarlated factors of safety <br />varying between 1.99 ar-d 2.35. <br />The author used PCSTABL to evaluate sbpe stability at section 36+40. This section <br />appeared to have the steepest sbpe between the embankment and river of any cross <br />sections presented by Anderson Consulting. Static conditions and river side and pit side <br />
The URL can be used to link to this page
Your browser does not support the video tag.