Laserfiche WebLink
March 16, 2007 <br />Dear, Sharon, Jill Mr. & Mrs. Mirabito <br />Attached is the proposed test well <br />placement plan and monitoring plan for <br />the Thompson Resource Pit. I submitted <br />this plan for review with the Division <br />of Reclamation, Mining b Safety on March <br />15, 2007 to address the Mined Land Rec- <br />lamation Board order Stipulation #2. We <br />placed one of the three test wells in <br />close proximity to your property to <br />better monitor the ground water levels <br />without disrupting your well. As you <br />may know no water will be drawn from <br />these wells they will only be used to <br />measure the depth to the ground water in <br />the area. They were placed on the site <br />so they would be between your water <br />supply well and the mining area to <br />better monitor the whether mining would <br />have any impact on the ground water <br />table. Carl Mount will be reviewing the <br />plan since Rick Wenzel has left the <br />Division. <br />If you have any questions please call me <br />at (303) 423-7297 or Carl at (303) 866- <br />3567 <br />~.e~a-v~ S, <br />~~ a.../ ~ <br />G~PT, <br />