Laserfiche WebLink
°' FIG. 1 <br />NEW ELK MINE <br />• POND 007 STAGE - VOLUME ANALYSIS - INCLUDING THICKENER VOLUME <br />Total Storage Capacity <br />10 yr. - 24 hr. Storm <br />Remaining Volume <br />Thickener Volume <br />Sediment Storage Capacity <br />STAGE VOLUME CURVE <br /> 7384 <br />• <br /> 7382 <br /> 7380 <br />ELEVATION <br />(Feet) 7378 <br /> 7376 <br /> 7374 <br /> ** <br /> 7372 <br /> 7370 <br /> 7368 <br />0 1 2 3 4 5 6 <br />. VOLUME <br />(Acre-Ft.) <br />* New Elk Permit <br />** Sediment Clean-out Level <br />8.54 Acre-Ft. <br />4.76 Acre-Ft. <br />_3.78 Acre-Ft. <br />2.16 Acre-Ft. <br />1.62 Acre-Ft. <br />7 8 9 10 <br />