My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-03-31_REVISION - M1977344 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977344
>
2003-03-31_REVISION - M1977344 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:55:54 PM
Creation date
11/21/2007 8:36:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Revision
Doc Date
3/31/2003
Doc Name
Response to Adequacy Review
From
Holcim
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division of Minerals and Geology <br />March 31, 2003 <br />Page 1 of 17 <br />Response to Division of Minerals and Geology November 25, 2002 Adequacy Review <br />Holcim (US) Inc. AM-1 Portland Limestone Quarry <br />Permit No. M-1977-344 <br />The following numbered paragraphs correspond to the numbering system in the November 25, <br />2002 adequacy review by DMG. <br />General <br />DMG: In accordance with Rule 6 Section 1.](2)(d), show the proposed permit boundary on the <br />Exhibit Cfig.C-4 and C-6 maps. <br />Response: <br />The appropriate figures have been revised to show the proposed permit boundary. Note that, with <br />this response to the DMG adequacy review, Holcim has modified previously submitted figures <br />and prepared new ones, all of which are attached to this response. The result has been to change <br />the total number of figures as well as the numbering system, as shown below. Holcim's <br />responses to the items raised by DMG will make reference to the new drawings and numbering <br />system. <br />Orieinally submitted fiQUres: <br />Figure C-1: Adjacent Landowners <br />Figure C-2: Mining Plan Map <br />Figure C-3: Aerial Photo <br />Figures as submitted with this response: <br />Figure C-1: Adjacent Landowners <br />Figure C-2: Mining Plan Map <br />Figure C-3: Mining Plan Map with Aerial <br />Photo <br />Figtrre C-4: Bear Creek Diversion Alignment <br />& Profile <br />Figure C-5: Bear Creek Diversion Typical <br />Cross Sections <br />Figure C-6: New & Existing Facilities <br />Figure F-1 Reclamation Plan <br />Figure C-4: Quarry Cross Sections <br />Figure C-5: Bear Creek Relocation Plan & <br />Profile <br />Figure C-6 through C-8: Bear Creek Relocation <br />Cross Sections <br />Figure C-9: Bear Creek Relocation Details <br />Figure C-10: New & Existing Facilities <br />Figure F-1: Reclamation Plan <br />Holcim Response to Amendment Adequacy Review.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.