Laserfiche WebLink
Division of Minerals and Geology <br />March 31, 2003 <br />Page 17 of 17 <br />to the Exhibit C map, in accordance with Rule 6 Section 4.3 (g)). The Division considers the <br />pipeline to be significant and valuable. It is obvious that the pipeline, where it crosses the <br />extraction area, will have to be avoided, protected or moved several years from now when mining <br />approaches it. Provide a notarized agreement between the present owner of the pipeline and <br />Holcim agreeing that Holcim will compensate the owner for any damage to the pipeline. Provide <br />a plan for protection, or removal or relocation of the pipeline. The plan must be reviewed and <br />agreed to in writing by the owner on his letterhead and a copy provided to the Division. If such <br />an agreement can not be reached, the following stipulation will be added to the approval of this <br />proposed amendment. <br />Stipulation No. 1-Holcim will not affect land within 200 feet of the natural gas pipelinE <br />located in cuts 13, 14, 16 and 18 without first having an agreement with the owner of that <br />pipeline for protection ,removal or relocation of the pipeline. A copy of the agreement, on <br />the owner's letterhead, will be filed with the Division and become a part of the permit. <br />Division approval must be obtained prior to affecting land within 200 feet of the pipeline. <br />Response: <br />Holcim has been in contact with the natural gas company (Colorado Interstate Gas), and will be <br />setting meetings to discuss and negotiate the relocation of the pipeline to an area where it will not <br />be impacted by the mining activities. <br />ATTACHMENTS <br />1. Table D-1: Mine Planning Details (CONFIDENTIAL INFORMATION) <br />2. Exhibit E: Reclamation Plan (revised 3-31-03) <br />3. Preliminary Bear Creek Relocation Hydraulic Modeling Study <br />4. February 5, 2003 letter from A. Notary, Blasland, Bouck & Lee, Inc. to Casey Cooley, <br />Colorado Division of Wildlife <br />5. DRAWINGS: <br />a. Figure C-1: Adjacent Landowners <br />b. Figure C-2: Mining Plan Map <br />c. Figure C-3: Mining Plan Map with Aerial Photo <br />d. Figure C-4: Quarry Cross Sections <br />e. Figure C-5: Bear Creek Relocation Plan & Profile <br />£ Figure C-6 through C-8: Beaz Creek Relocation Cross Sections <br />g. Figure C-9: Beaz Creek Relocation Details <br />h. Figure C-10: New & Existing Facilities <br />i. Figure F-1: Reclamation Plan <br />Holcim Response to Amendment Adequacy Review.dce <br />