Laserfiche WebLink
Mined Land Reclamation Board <br /> August 10, 1981 <br /> Page 2 <br /> Revise mining sequence as shown on revised excavation and reclama- <br /> tion plan maps . There will be five areas of excavation as shown . <br /> Part of the eastern side of Excavation Area 2 (already excavated) <br /> is being backfilled. The north 400± feet of Excavation Area 4 <br /> will be backfilled. These backfilled areas will be used for <br /> industrial development . <br /> The west side of the central north-south road (9 . 07± acres) will <br /> be available for development of other industrial uses as dictated <br /> by local demand. On the east side of the central north-south road <br /> Mobile Premix, Inc . will construct offices, warehouses and stor- <br /> age areas on 3. 75 acres for a total of 12 . 82 acres of industrial site . <br /> Also on the east side of the central north-south road Mobile Pre- <br /> mix, Inc. operates a concrete batch plant , with associated speci- <br /> fication aggregate stockpiles, on 8 . 73± acres . This activity <br /> will continue lone after completion of mining and reclamation of <br /> the affected land. In other words , the use of the 8. 73± acres is <br /> as a permanent industrial site not associated with mining. <br /> Mining and reclamation timetables for the revised plans follow : <br /> Mining Timetable <br /> August 1981 <br /> Mining Acres ± <br /> Period Total Excavation Plant , <br /> Area (Years) Area Area Setbacks Roads etc . <br /> 1 Complete 13. 10 11 . 38 1 . 72 -- -- <br /> 2 Complete 19. 82 14 .47 5. 35 -- -- <br /> 3 1-2 28.63 25.67 2 .96 -- -- <br /> 4 2-4 9.01 7. 74 1 . 27 -- -- <br /> 5 5-7 24 . 11 21 .40 2.71 -- -- <br /> Road Permanent 5. 72 -0- -- 5. 72 -- <br /> Plant Permanent 12 . 36* 3 .63** -- -- 8 . 73 <br /> Total Acres 109. 12 80.66 14 .01 5. 72 8 . 73 <br /> * Includes 3.63t acres to be mined in excavated area 5 <br /> ** This acreage included in 21 . 40t acres mined in excavated <br /> area 5 <br />