My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-05-26_REVISION - M1991083
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991083
>
2004-05-26_REVISION - M1991083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:08:09 PM
Creation date
11/21/2007 8:33:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991083
IBM Index Class Name
Revision
Doc Date
5/26/2004
Doc Name
Conversion Appl
From
Seifert Construction
To
DMG
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.1.4 Public Use <br />The Operator/Applicant and Landowners do not propose the use of this land by the <br />public. Mining will be done by an MSHA approved contractor and the public will not be <br />allowed on site without a company representative. Part 46 of MSHA will be followed <br />on this site. <br />3.1.5 Reclamation Measures -Material handling <br />(1) Grading shall be carried on so as to create a final topography appropriate to the <br />final land use selected in the Reclamation Plan. <br />(2) Unsold processed material and/or reject material may be used as backfill. All <br />backfil! material will be compacted in place to insure stability. No toxic or acid-forming <br />materials will be on site nor will any be delivered to this mine site. <br />(3} All grading shall be done in a manner to control erosion and siltation of affected <br />lands. <br />Best Management practices of mining will be used to protect areas outside the <br />affected land from slides and other damage. No highwaNs are planned at this open <br />pit mine. <br />(4) All backfilling and grading will be completed as soon as feasible after the mining <br />process. The operator will establish reasonable timetables consistent with good <br />mining and reclamation procedures. Grading of backslopes will be as mining is <br />occurring, and the pit floor will be contoured for seeding as mining proceeds. <br />Topsoiling will be accomplished after mining has moved away far enough to make it <br />practical for seedbed prep and seeding. Also, time of year and weather conditions <br />will play a role in this timing. <br />(5) No refuse wil! be generated by this mining operation for cleaning and preparation <br />of substances mined. No acid-forming or toxic-producing materials will be mined or <br />used for processing at this sand and gravel mining -processing plant. Therefore, no <br />plans have been developed for their handling. <br />(6) There will not be any drill or auger holes unfilled after mining. All exploration will <br />most likely be done with small bore coring by a trained crew or by backhoe in selected <br />areas, and after discovery, all holes shall be backfilled as soon as possible. No adits <br />or shafts will be employed in this open pit. <br />(7) Maximum slopes and slope combinations shall be compatible with the <br />configuration of the surrounding conditions and selected land use. Side slopes will <br />be graded to a maximum 3H:1V . <br />
The URL can be used to link to this page
Your browser does not support the video tag.