Laserfiche WebLink
• <br />6.2 Water <br />a. Hydrology and Water Quality -The mining operation will be in compliance with <br />applicable water laws and regulations governing injury top existing water rights. The <br />mining and reclamation operations will not require the use of any water, nor will the <br />maintenance of the proposed conservation/wildlife habitat. The operation will also <br />be incompliance with applicable federal and state water quality laws and regulation. <br />A NPDES permit will be obtained and sufficient treatment of the discharged water <br />will be performed to meet permit limitation (see Wa[er Management Plan). The <br />operation will be incompliance with Section 404. <br />b. Earth Dike -There will be a section of the lake that would have a temporary dike to <br />hold water to prevent Weld County from pumping well water down in that azea. <br />