My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-01-31_REVISION - M1986015 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986015
>
2007-01-31_REVISION - M1986015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:42:30 PM
Creation date
11/21/2007 8:25:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
Revision
Doc Date
1/31/2007
Doc Name
Amendment
From
Continental Materials Corporation
To
DRMS
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN <br />Exhibit D -AMENDMENT 3 <br />Mining Plan <br />(This is a complete rewrite and revision of Amendment l and Amendment 2) <br />STATEMENT OF APPLICABILITY OF THIS PLAN <br />This exhibit is designed to completely replace all prior mining plans for [his site. The exhibit <br />presents the mining plan for changes in Phase 1 plus the plans included in Amendment 2, which added a <br />small parcel to Phase 1, as well as plans for [he new Phase 2 area. This mining plan is a complete redesign <br />of the operation and is the only valid mining plan for this site. Although some aspects of the original <br />plans have been carried over in an unaltered form, the continuation of those aspects occurs only because <br />they still work in [he new plan. <br />Unique Term Definitions: <br />Groundwater Barrier Wall: In this plan this term applies to a barrier installed around al] or a part of <br />the area to be mined that prevents or greatly reduces the flow of <br />groundwater into the area during mining. In this plan it specifically refers <br />to either a "slurry wall" or a "driven sheet piling steel wall." In some <br />cases, specific actions differ with regard to the type of wall. In those <br />cases, [he actual type of wall is stated rather than [his inclusive term. <br />~~4 P°'sa r~----y <br />a ~•' 4 <br />tifilV 1 ~ l~~l <br />Mining anG Ssf~iy <br />Pueblo East Pit Amendment 3 (2007) Exhibit D Page 1 of 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.