Laserfiche WebLink
AT <br />LIST OF RECLAMATION PLAN REQUIREMENTS <br />The following list of requirements are exactly like the ones contained within the body of this <br />exhibit. This list can be used as a table of contents or a quick reference during the implementation of the <br />permit. For additional information on a requirement please refer to the page number stated at the end of <br />the requirement shown in this list. Most requirements have discussions in the body of the exhibit, <br />Post-Mining Land Use - <br />Requirement: Industrial, water storage, and wildlife habitat will be applied to various <br />portions of the affected land in accordance with the layout shown on Exhibit F-2. (No <br />discussion associated with this requirement) <br />Requirement: The sediment basin areas in the backfilled Phase 1 will be reclaimed to <br />riparian forest and related habitats. (No discussion assodated with this requirement) <br />Requirement: Phase 2 will be reclaimed to a water storage final land use. (See Page 8) <br />Requirement: The Plant Site will be reclaimed to industrial use unless the platform is <br />removed and used for fill in which case it will be merged with adjacent habitat. <br />(See Page 8) <br />Requirement: Affected land east of the drainage ditch east of the plan[ will be reclaimed to <br />wildlife habitat with a more aquatic character. (See Page 9) <br />Materials Handling - Backfilling - <br />Requirement: The backfilled Phase I area will have a general slope to the southeast with <br />the northwestern corner being about 4 to S feet higher than the southeastern corner. (No <br />discussion associated with this requirement) <br />Requirement: The surface of the backfilled Phase 1 will have a small scale topographic <br />roughness composed of broad ridges and valleys that have a maximum relief of about 0.5 to <br />1 foot between the crests of the ridges and the bottoms of the valleys. (See Page 9) <br />Pueblo East Pit Amendment 3 (2007} Exhibit E Page 2 of 21 <br />