My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-01-31_REVISION - M1986015 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986015
>
2007-01-31_REVISION - M1986015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:42:30 PM
Creation date
11/21/2007 8:25:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
Revision
Doc Date
1/31/2007
Doc Name
Amendment
From
Continental Materials Corporation
To
DRMS
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the pit, if [he groundwater barrier wall was put completely around the pi[, that parcel of land would <br />essentially become a sump. Not only would water from 25`" Lane likely fill this area, potentially creating <br />a swamp, but eventually waste from the septic systems would render the water in this sump highly <br />undesirable. It became clear that there needed to be a well defined pathway for both groundwater and the <br />contained septic system water to leave [he area. <br />As discussed later in the actual mining plan for Phase 2, [his problem will be solved by not <br />sealing the northeastern corner of the Phase 2 area. In fact, that must be [he very first location for mining. <br />The reclamation of this isolated, unsealed pit is discussed in the Reclamation Plan, Exhibit E. <br />STEP 3: Topsoil Salvage and Stockpiling <br />Requirement: Soil over lands to be mined shall be removed prior to mining. Soil will be removed <br />from each area as it is opened for mining rather than over [he entire area all at once. <br />DISCUSSION: Topsoil within the amendment area is important to [he successful <br />establishment of the post-mining vegetation in this area. The soil resources here cannot be lost or, in some <br />areas, the revege[ation requirements may not be sufficiently met. More detail on the use of soil and <br />overburden [o accomplish [he intended final use is provided in the next section of [his exhibit as well as in <br />the Reclamation Plan (Exhibit E). <br />All soil above the overburden layer will be removed and stockpiled in locations that will allow <br />for easy replacement over the backfilled pit. Soil removal will not occur over the entire area all at once. <br />Instead, it will occur as new areas are opened for mining. <br />Requirement: Most of the soil removed from Phase 2 will be taken to Phase 1 for use as topdressing <br />for backfilled areas. Sufficient Phase 2 soil will be retained in Phase 2 for use in topdressing <br />completed pit slopes above the expected high water level of a reservoir established after completion <br />of mining. <br />DISCUSSION: Movement of soil from Phase 2 will primarily be into Phase 1 where it will be <br />most needed to topdress areas that are completely backfilled. Some soil will be retained in Phase 2 though <br />as some will be needed to topdress the zone above where the anticipated maximum water level would be <br />with a reservoir. It is expected that soil to be retained for use in Phase 2 will be stockpiled in the overflow <br />barrier berm on the southern side of the operation near the river. A[ the end of the operation this can [hen <br />be distributed on the upper parts of the final slopes just prior to establishment of a reservoir. <br />Pueblo East Pit Amendment 3 (2007) Exhibit D Page 26 of 34 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.