Laserfiche WebLink
-2- <br />F.XATRIT n -Mining Plan ($p1e 6.4.41 The mining plan shall supply the following information, correlated with the <br />affected lands, map(s) and timetables: <br />(a) description of the method(s) of mining to be employed in each stage of the opemtion as related to arty <br />surface disturbance on affected lands; <br />(b) earthrnoving; <br />(c) all water diversions and impoundments; and <br />(d) the size of area(s) to be worked at any one time. <br />(e) An approximate timetable to descnbe the mining operation. The timetable is for the purpose of <br />establishing the relationship between mining and reclamation during the different phases of a mining operation. You <br />will not be required to meet specific dates for initiation, or completion of mining in a phase as may be identified in the <br />timetable. This does not exempt you fiom complying with the performance standards of Section 3.1. Such timetable <br />should include: <br />the operation; <br />(i) an estimate of the periods of time which will be required for the vazious stages or phases of <br />(ii) a description of the size and location of each area to be worked during each phase; and <br />(ui) outlining the sequence in which each stage or phase of the opemtion will be carried out. <br />(Timetables need not be separate and distinct from the mining plan, but may be incorporated therein.) <br />(t) A map (in Exhibit C -Pre-Mining and Mining Plan Maps(s) of Affected Lands, Subsection 6.4.3) may <br />be used along with a narrative to present the following information: <br />(i) nature, depth and thickness of the ore body or deposit to be mined and the thickness and type <br />of overburden to be removed (may be mazked "CONFIDENTIAL," as per Paragraph 1.3 (3)); and <br />(ii) nature of the stratum immediately beneath the material to be mined in sedimentary deposits. <br />and <br />(g) Identify the primary and secondary commodities to be minedlextracted and describe the intended use; <br />(h) name and descnbe the intended use of all expected incidental products to be mined/extracted by the <br />proposed operaflon. <br />F.XRiRTT F. - Rrrlamatinn Plan fgnir F_4_sl~ (1) In preparing the Reclamation Plan, you should be specific in teens <br />of addressing such items as final grading (including drainage), seeding, fertilizing, revegetation (trees, shrubs, etc.), and <br />topsoiling. You aze encouraged to allow flexibility in your plans by committing to ranges of numbers (e.g., 6"-12" of <br />topsoil) rather than specific figures. <br />(2) The Reclamation Plan shall include provisions for, or satisfactory explanation of, all general requirements for <br />the type of reclamation proposed to be implemented by you. Reclamation shall be required on all the affected land. The <br />Reclamation Plans shall include: <br />(a) A description of the type(s) of reclamation you propose to achieve in the reclamation of the affected <br />land, why each was chosen, the amount of acreage accorded to each, and a general discussion of methods of reclamation <br />as related to the mechanics of earthmoving; <br />