Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : DMG <br />003 State :Colorado <br />03/05/2003 County :Fremont <br />JDl Site :Penrose Ranch <br />Permitlob # : M-1992-016 <br />Abbreviation :none <br />Filename : MO16-003 <br />Permit or other job action :Phased Reclamation - 100 Acres <br />Task description :place topsoil on backfilled slopes <br />HOURLY EQUIPMENT COST <br />Cost Bre <br />Shift basis : 1 per day <br />Scraper work team -Scraper :Cai 623G <br />-Push dozer : NA <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhipcost/hour: $48.31 NA NA NA NA NA <br />Operating cost/hour : $82.98 NA NA NA NA NA <br />Ripper op.cosUhour: NA NA NA NA NA NA <br />Operator cosUhour : $25.43 NA NA NA NA NA <br />Unit subtotals : 5156.72 NA NA NA NA NA <br />Number of units : 1 0 0 0 0 0 <br />Group subtotals : Work : 5156.72 Support : 50.00 Maintenance : $0.00 <br />Total work team cosUhour : $156.72 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 9,035 CCY factor : 1.215 volume : 10,978 LCY <br />Source of quantity take-off :calculation <br />Source of estimated swell factor :program <br />