My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-03-05_REVISION - M1992016 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992016
>
2003-03-05_REVISION - M1992016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:36:00 PM
Creation date
11/21/2007 8:00:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992016
IBM Index Class Name
Revision
Doc Date
3/5/2003
Doc Name
Cost Summary Form
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 03/05/2003 <br />User: JDi <br />State :Colorado <br />County :Fremont <br />Site :Penrose Ranch <br />PermiUjob# : M-1992-016 <br />Abbreviation :none <br />Filename : M016-002 <br />Agency or organization name : DMG <br />Permit or other job action :Phased Reclamation - 100 acres <br />Task description : CCBBtB 3:1 slopes with beCkf%Il ttlateYiel <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Basic machine :Cat D6R LGP - 6S <br />Blade type :Straight <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : NA <br /> <br /> Utilization <br />Ownership cosUhour : $26.40 NA <br />Operating cosVhour : $36.30 100 <br />Ripper op.cosVhour: $0.00 NA <br />Operator cosUhour : $24.01 NA <br />Total unit cost/hour : $86.71 Total fleet cost/hour <br />$86.71 <br />Initial Swell Loose <br />volume : 10,640 LCY factor : NA volume : 10,640 LCY <br />Source of estimated volume : calculation <br /> <br />Source of estimated <br />swell factor <br />: NA _ <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 444.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshrft/day) <br />Loose_stockpile Spoil pile : 0.80 (ind-A) <br /> Push gradient : 0.42 (Cat HB) <br />Average push gradient : 25.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,300 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.22 <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 9724 LCY/hr <br /> Adjusted fleet production : 97.24 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 109.42 Hours <br />Unit cost : $0.892 /LCY Total job cost : $9,487 <br />Horsepower: 185 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.