Laserfiche WebLink
Colorado Division of Minerals and Geology sheet 1 of 2 <br /> ESTIMATING FORM - EQUIPMENT MOBILIZATION / DEMOBILIZATION <br /> ....._..=....s=:.=:s==s=:===.........s................... <br /> Task N... 8 Prep. by CLK Fitenane..M020-8 <br /> Date..... 24-Ju1-95 Permit 6 M-80-020 Mine......Braley Sand & Gravel Pit Ni <br /> Permit Action........ Re-estimate bond <br /> Task Description..... Mob & De-mob <br /> ---- <br /> HOURLY EQUIPMENT COST <br /> NOTE - This is a list to select from, not a list of mandatory items to include. <br /> Mob/Demob Eqp. -Tractor : 6x4, 75,000 lb GVw, 375 HP, diesel powered <br /> -Lt. Trailer : 25 ton folding gooseneck, drop deck <br /> -Med. Trailer : 50 ton folding gooseneck, drop deck <br /> -Hvy. Trailer : 120 Ton folding gooseneck, drop deck <br /> -Pilot Car : On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br /> -Hyd. Crane : Grove RT58D rough terrain hydraulic crane, 20 ton capacity, 125 hp, 60 ft. boon <br /> -Fuel Truck 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br /> -tube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br /> -Flatbed Truck: 20,000 lb GW, 175 HP, diesel powered <br /> Last Update: ------------ <br /> December, 1994 <br /> ------^------ Lt. Rig Med.Rig Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br /> Cost Breakdown: <=25 T. 26-50 T. > 50 T. Car Crane Truck Truck Truck <br /> = Z Z S Z Z 5 <br /> Ownership Cost/hr = 527.88 $31.23 538.36 $1.81 $19.89 56.95 $12.79 $5.71 <br /> Operating Cost/hr = $26.84 $29.29 $34.27 55.12 523.40 $18.53 $24.52 $8.00 <br /> Operator Cost/hr = 521.40 522.03 522.03 521.24 $20.86 $21.24 521.24 $21.24 <br /> Helper Cost/hr = $20.60 $21.24 $21.24 SO.00 SO.00 $0.00 $0.00 $0.00 <br /> ------- ------- ------- ------- ------- ------- .-..... -----.- <br /> Total = 596.72 $103.79 $115.90 $28.17 564.15 $46.72 558.55 $34.95 <br /> NON-ROADABLE EQUIPMENT: <br /> --------- Weight ownership Haul Rig Ft eat Size Haul Trip Return Trip DOT Permit <br /> Machine Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br /> S <br /> Reveg. equipment 15.00 530.00 596.72 1 $126.72 $96.72 <br /> Subtotals 5126.72 $96.72 50.00 <br /> -------- ----_-_ _-^-__-_- <br />