Laserfiche WebLink
HOURLY PRODUCTION: <br /> Jab Condition Correction Factors <br /> Scraper Cycle Time I ------_ <br /> Site altitude = 6000 ft. <br /> Load 0.6 min. I ------- <br /> Alt, adjustment .. 0.97 <br /> Maneuver 3 spread = 0.6 min. I Job efficiency ... 0.83 (tsh/d) <br /> ----------- <br /> Trove( time (haul R return): I Net Correction 0.8051 <br /> Haul route---^V-_—� <br /> Road Length Grade Rolling Total Velocity Travel time- <br /> seg. 0 (ft) res.(%) res.(%) res.(%) (fpn) (min) <br /> 1 600 15.00 4.00 -11.00 1505 0.56 <br /> -- � Haut time = 0.56 min. <br /> Return route ---------- <br /> 1 600 15.00 4.00 19.00 905 — 0.77- <br /> •1st 8 last seg. adj. for accel./decel. Return time = - —0.77y min. <br /> I ---------- <br /> Total Cycle Tine = 2.52 min. I <br /> —^--^- I Machine Volume <br /> Machine Payload I ---- <br /> ---------^----^ I Struck capacity = 21.00 <br /> Material weight = 2300.00 lbs/LCY I Heaped capacity = 31.00 <br /> Mat, description : ------- I -------•--• <br /> GENERAL FILL I Average = 26.00 LCY <br /> -----_—__-_--__.-_ __-_____-__ <br /> Rated Payload....= 75,000 tbs. I Adjusted volume = 26.00 LCY <br /> Payload volume...= 32.61 LCY <br /> Unadjusted production per scraper or push-pull pair : 618.74 LCY/hr <br /> Adjusted production.................................: 498.15 LCY/hr <br /> Adjusted hourly ft eet production....................: 996.29 LCY/hr <br /> J08 COST: <br /> Fleet size : 2 Scraper(s) Total Job Time: 8.73 Hours <br /> Unit Cost : _SO.569 /LCY Total Job Cost: -M__$4,954 <br />