My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-07-26_REVISION - M1980020
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980020
>
1995-07-26_REVISION - M1980020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 2:28:54 PM
Creation date
11/21/2007 7:40:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980020
IBM Index Class Name
Revision
Doc Date
7/26/1995
Doc Name
INCREASE IN FINANCIAL WARRANTY FOR MINERAL PN M-80-020 BRALEY SAND & GRAVEL PIT 1
From
DMG
To
BRALEY SAND & GRAVEL INC
Type & Sequence
HR3
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION: <br /> Jab Condition Correction Factors <br /> Scraper Cycle Time I ------_ <br /> Site altitude = 6000 ft. <br /> Load 0.6 min. I ------- <br /> Alt, adjustment .. 0.97 <br /> Maneuver 3 spread = 0.6 min. I Job efficiency ... 0.83 (tsh/d) <br /> ----------- <br /> Trove( time (haul R return): I Net Correction 0.8051 <br /> Haul route---^V-_—� <br /> Road Length Grade Rolling Total Velocity Travel time- <br /> seg. 0 (ft) res.(%) res.(%) res.(%) (fpn) (min) <br /> 1 600 15.00 4.00 -11.00 1505 0.56 <br /> -- � Haut time = 0.56 min. <br /> Return route ---------- <br /> 1 600 15.00 4.00 19.00 905 — 0.77- <br /> •1st 8 last seg. adj. for accel./decel. Return time = - —0.77y min. <br /> I ---------- <br /> Total Cycle Tine = 2.52 min. I <br /> —^--^- I Machine Volume <br /> Machine Payload I ---- <br /> ---------^----^ I Struck capacity = 21.00 <br /> Material weight = 2300.00 lbs/LCY I Heaped capacity = 31.00 <br /> Mat, description : ------- I -------•--• <br /> GENERAL FILL I Average = 26.00 LCY <br /> -----_—__-_--__.-_ __-_____-__ <br /> Rated Payload....= 75,000 tbs. I Adjusted volume = 26.00 LCY <br /> Payload volume...= 32.61 LCY <br /> Unadjusted production per scraper or push-pull pair : 618.74 LCY/hr <br /> Adjusted production.................................: 498.15 LCY/hr <br /> Adjusted hourly ft eet production....................: 996.29 LCY/hr <br /> J08 COST: <br /> Fleet size : 2 Scraper(s) Total Job Time: 8.73 Hours <br /> Unit Cost : _SO.569 /LCY Total Job Cost: -M__$4,954 <br />
The URL can be used to link to this page
Your browser does not support the video tag.