Laserfiche WebLink
Colorado Division of Minerals and Geology <br /> ESTIMATING FORM - SCRAPER WORK <br /> TASK NO. 4 PREP. BY:' CLK PERMIT NO. M-80-020 <br /> DATE 07/24/95 FILENAME: 14020-4 MINE: Braley Send 3 Gravel <br /> PERMIT ACTION : re-estimate bond- <br /> ^ <br /> TASK DESCRIPTION : Spread overburden overasphalt A concrete�M <br /> HOURLY EQUIPMENT COSTS: <br /> =•__________________= Single, Double or Triple <br /> County:DOUGLAS Labor Zone : 1 Shifts :S <br /> ----------- -------- ---------- <br /> Equipment Descriptions <br /> Scraper team make-up : CAT 637E with 1-D9N push loading dozer 8 ROPS cab <br /> Road meint. - Grader ; N/A <br /> - Water T., N/A <br /> -"-"--------------—-------'----------- <br /> Scraper Team Road Maintenance <br /> Scraper Dozer(s) Grader Water truck <br /> Equipment Filenaw:637ED9N1 0 N/A N/A <br /> Utilization on job:100% 86% N/A N/A <br /> Cost Breakdown: <br /> Ownership cost/hr: $67.47 S41.88 N/A N/A <br /> Operating cost/hr: $128.59 $64.11 N/A N/A <br /> Operator cost/hr: $23.13 S22.95 N/A N/A <br /> -------- -------- --------- ......... <br /> Unit subtotals: $219.20 $128.93 N/A N/A <br /> Scraper team subtotal . S567.32 Maint, subtotal N/A <br /> Total Work Team Cost/Hr: S567.32 <br /> MATERIAL QUANTITIES: <br /> Beg. <br /> Volume: 7733 CCY <br /> Cu.Yd. ---------- Swell Loose <br /> Volume: 7,733 CCY Factor: 1.125 Volume: 8,700 LCY <br /> - -Source of quantity take-off: site figures <br /> Source of est. swell factor: ref. <br /> I <br />