Laserfiche WebLink
6. Final earthwork will put back the ground surface to a stable condition, which will include <br />revegetation of some areas. Though we will not calculate any change in bond amount as part of <br />this technical revision, please note that all affected areas will be monitored for geotechnical and <br />structural stability, erosion, sediment transport, and revegetation success. If inadequacies or <br />problems develop in the future, these items will require additional work. <br />At this time, this office is approving technical revision TR-11. Please be aware that certain <br />written, drafted or photographic documentation is required at the conclusion of the project. This <br />office does not foresee the need for our overseeing the construction, but would be interested in <br />observing if it fits our schedule. You might ]et us know when something is scheduled, so that we <br />may be onsite. I am assuming that Homestake will require a quali5ed person will to be onsite <br />supervising this project. <br />Thank you for the quality of the submitted materials. If you wish to contact me I can be reached <br />at the Division's Durango field office: 701 Camino del Rio, Room 125, Durango, CO 81301; <br />telephone 970/247-5193, and fax 970/247-5104. <br />Sincerely, <br />~~ ~/ <br />Bob Oswald <br />Environmental Protection Specialist <br />A:\bulldog trl l appr/rco <br />