My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-06-04_REVISION - M1995057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995057
>
2002-06-04_REVISION - M1995057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:57:00 PM
Creation date
11/21/2007 7:33:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995057
IBM Index Class Name
Revision
Doc Date
6/4/2002
Doc Name
Adequate for Approval
From
DMG
To
Gunnison Gravel
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Date: 04-Jun-2002 <br />User : RCO <br />Permit or job no.: M-1995-05T Site : Rudibaugh Pit <br />Abbreviation : none State : Cclorado <br />Filename : M057-000 County :Gunnison <br />Agency or organization name : DMG <br />Permit or iob action : TR-01 and routine bond <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Rip and grade affected area, remove sett/ement pond dozer 1 7.03 $449 <br />002 -Revegetate site according to plan revege 1 5.0 $314 <br />003 -Haul reclamation equipment to and from site mobilize 1 3.44 $778 <br />004 -Remove misc. debris from site (assume 10 cV) NA 1 2.0 $70 <br />'includes inflation factor adjustment of : NA <br />INDIRECT COSTS <br />suarorALS: 17.4 $1,611 <br />TOTAL DIRECT COST= $1,611 <br />OVERHEAD AND PROFIT- Llablllty ln511ranCe: 1.55 %Of direcf total= $25 <br />Pertormance bond : 1.05 / of direct total = $17 <br />Job superintendent : NA` NA NA total = NA <br />Profit : 10.00 % of direct total = $161 <br />'not requiretl for eqp. operator serves as supac) TOTAL O 8 P = $203 <br /> CONTRACT AMOUNT (direct + O 8 P) _ $1, 814 <br />PROJECT MANAGEMENT- <br />Engineering work andfor contracUbid preparation : NA NA NA total = NA <br />Reclamation management andlor administration : 5.00 % of cntr. NA total = $91 <br />CONTINGENCY- NA` NA total = NA <br />'cont/ngencles accounted lorat task level TOTAL INDIRECT COST= $294 <br /> TOTAL BOND AMOUNT (direct+ indirect) _ $1,905 <br />
The URL can be used to link to this page
Your browser does not support the video tag.