My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-01-25_REVISION - M1979002
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979002
>
2005-01-25_REVISION - M1979002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:44 AM
Creation date
11/21/2007 7:24:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979002
IBM Index Class Name
Revision
Doc Date
1/25/2005
Doc Name
Cost Estimate
From
DMG
To
File
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 04a <br />Date : 01/24/2005 <br />User: SSS <br />State :Colorado <br />County :Delta <br />Site :North Delta Pit <br />Agency or organization name : DMG <br />Permit or other job action :Routine bond recalculation <br />Task, description :Replace topsoil on /akeshore <br />HOURLY EQUIPMENT COST <br />Permit/job# : M-1979-002 <br />Abbreviation :none <br />Filename : M002-04a <br />Basic machine :Cat D7R Series 11 - 7SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 240 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $40.61 NA <br />Operating cosUhour : $48.13 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $31.76 NA <br />Total unit cosUhour : $120.50 Total fleet cosUhour : $120.50 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 1,205 LCY <br />Swell Loose <br />factor: NA volume <br />Source of estimated volume :Assume 2600'L x 25'W <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,022.9 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Top Soil <br />30.00 % (i <br />4,940 feet <br />1,600 Ibs/LCY <br />1,205 LCY <br />covered with 6" of <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />................ <br />Source <br />0.75 (avg.) <br />1.10 (Cat HB) <br />1.00 (gen-) <br />1.00 (avg.) <br />0.83 (lshifUday) <br />0.70 (fnd-m~ <br />1.60 (Cat HB) <br />1.00 (Cat HB) <br />1.44 (Cat HB) <br />1.00 (S/SU/U) <br />1.10 <br />1128.20 LCY/hr <br />,128.20 LCY/hr <br />JOB TIMEAND COST ~ ~~ -~ - - - <br />Fleet size : 1 Dozers} Total job time : 1,07 <br />Unit cost : $0.107 /LCY Total job cost : $1yg <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.