Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 03a <br />Date : 01/24/2005 <br />User : SSS <br />State :Colorado <br />County :Delta <br />Site :North De/ta Pit <br />Agency or organization name :DMG <br />Permit or other job action :Routine bond recalculation <br />Task description :Rip facilities area prior to <br />HOURLY EQUIPMENT COST <br />PermiUjob # : M-1979-002 <br />Abbreviation :none <br />Filename : M002-03a <br />replacement <br />Basic machine :Cat D7R Series ll - 7SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank dpper <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $40.64 NA <br />Dozer operating cosUhour : $48.13 1p0 <br />Ripper operating cosUhour : $5.95 100 <br />Operator cosUhour : $31.76 NA <br />Total unit cost/hour : $126.47 Total fleet cosUhour <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic <br />Area <br />Selected estimating method <br />NA NA <br />7.00 acres <br />Loatl factor : NA Bank volume <br />Rip depth (ft) : 2.00 Volume <br />Source of estimated quantity :7 acre facilities area <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feeUsecond <br />Unadjusted production : NA cu. yds./hour <br />Area : Avg. ripping depth : 2.00 feeUpass <br />Average ripping width : 6.50 feeUpass <br />Average ripping length : 500.00 feeUpass <br />Average dozer speed : 88.00 feeUminute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.755 acres/hour <br />Unadjusted production : 2,435.08 cu. yds./hour <br />JOB TIME AND COST ~~-- <br />Fleet size : 1 dozers) <br />Unit cost : $0.063 per cu. yd. <br />Unadjusted production <br />per selected method <br />Horsepower: 240 <br />Shift basis : 1 perday <br />Area <br />$126.47 <br />NA BCY <br />22,587 BCY or CCY <br />2,435.08 cu. yds./hour <br />Site altitude : 4,940 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shifUday) <br />Netjob correction : 0.83 multiplier <br /> <br />Adjusted unit production : 2,021.12 cu. yds./hour <br />Adjusted fleet production : 2,021.12 cu. yds./hour <br />Total job time : 11.18 hours <br />Total job cost : $1,413 <br />Data source : (CRG) <br />