My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-12-30_REVISION - M1994117
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994117
>
2004-12-30_REVISION - M1994117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:27:07 PM
Creation date
11/21/2007 7:18:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
Revision
Doc Date
12/30/2004
Doc Name
Bond Calculation
From
DMG
To
File
Type & Sequence
SO3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 12/30/2004 <br />User : KAP <br />State :Colorado <br />County :Boulder <br />Site :Gold Hill Mill <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action : SO <br />Task description :Grade Topsoil <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series II <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank riooer <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 1,000 LCY <br />Swell <br />factor <br />8SU Horsepower: 310 <br />Utilization <br />$48.82 NA <br />$69.39 100 <br />$1.96 25 <br />$31.76 NA <br />$151.93 Total fleet cost/h <br />Loose <br />NA volume : 1,000 <br /> <br /> <br /> <br /> <br /> our <br />LCY <br />.93 <br />Source of estimated volume :Reclamation Plan <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors ~ Source ~~~ <br />Average push distance : 250 feet <br />Unadjusted hourly production : 377.8 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 5.00 % (i <br />Average site altitude : 8,290 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Top Soil <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.11 <br />Altitude : 1.00 <br />Material weight : 1.44 <br />Blade type : 1.00 <br />Net correction : 0.80 <br />Adjusted unit production : 301.56 LCY/hr <br />Adjusted fleet production : 301.56 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 3.32 Hours <br />Unit cost : $0.504 /LCY Total job cost : $504 <br />Permitfjob# : M-1994117 <br />Abbreviation :none <br />Filename : M117-002 <br />Ownership cosUhour <br />Operating cosUhour <br />Ripper op.cosUhour <br />Operator cost hour <br />Total unit cosUhour <br />Shift basis : 1 per day <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.