My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-12-30_REVISION - M1994117
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994117
>
2004-12-30_REVISION - M1994117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:27:07 PM
Creation date
11/21/2007 7:18:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
Revision
Doc Date
12/30/2004
Doc Name
Bond Calculation
From
DMG
To
File
Type & Sequence
SO3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :Colorado Division O(Minerals And <br />Permit or other job action : SO <br />Task description :Rip site <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Basic machine : Caf D8R Series II <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Alternate methods - <br />Seismic : NA NA Load factor <br />Area : 1.80 acres Rip depth (fl) <br />Shift basis : 1 per day <br />Selected estimating method : Area <br />NA Bank volume <br />2.00 Volume <br />NA <br />5,808 <br />BCY <br />BCY orCCY <br />Source of estimated quantity :Reclamation Plan <br />Source of estimated load factor : NA <br /> <br />,. :: <br />HOURLY PRODUCTION .. <br />.. <br />>, <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feeUsecond Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 2,494.65 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.00 feeUpass Site altitude : 8,290 feet <br />Average ripping width : 7.08 feeUpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 200.00 feeUpass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.773 acres/hour Adjusted unit production : 2,070.56 cu. yds./hour <br />Unadjusted production : 2,494.65 cu. yds./hour Adjusted fleet production : 2,070.56 cu. yds./hour <br />8SU Horsepower: 310 <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total job time : 2.81 hours <br />Unit cost : $0.076 per cu. yd. Total job cost : $443 <br />
The URL can be used to link to this page
Your browser does not support the video tag.