My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-09-01_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1999-09-01_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:39 AM
Creation date
11/21/2007 7:07:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
9/1/1999
Doc Name
SURFACE MINE RECLAMATION COST ESTIMATE BATTLE MTN RESOURCES INC SAN LUIS MINE
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Truck - 15 minute round trip (including load time) <br />6 [rucks making 4 round trips per hour <br />0.83 job efficiency = 3.32 round trips hour <br />Production Rates: <br />44,500 yd3 (l .l bulking factor) = 48,950 yd3 <br />48.950 yd3 / 20 yd3/truck load = 2,448 truck loads <br />2,448 trips (3.32 trips/trucl:/hour) = 737.34 hours/6 trucks = 123 hours <br />123 hours [($65/truck hour (6 trucks)] _ $47,970 <br />123 hours ($115/loader hour) _ $14,145 <br />TOTAL SPILLWAY/COLLECTION POND <br />CONSTRUCTION COSTS <br />REMAINING RECLAMATION COST OBLIGATION $78,490 ~" <br />~- <br />TOTAL TAILINGS FACILITIES <br />REMAING RECLAMATION COST OBLIGATION £41Q,I 1.5 <br />E. Mill Facilities <br />E.1 Building Demolition and Disposal JK <br />Building removal costs are estimated at $0.22/ft3 as estimated ir, R.S. <br />Means "Heavy Construction Cost Data", 12°i annual edition, 1998. <br />Structure <br />Administration Building (60x60x i 5)I <br />Laboratories (60x50x15)~ <br />Workshops/Warehouse (SOx90x15)~ <br />Warehouse Addition (40x70x14)~ <br />Vehicle Maintenance Shop (60x130x30)I <br />Crusher Building (75x70x75) <br />Screening Building (60x50x75) <br />Grinding Building (SOx70x50) <br />Filter Building (35x40x50) <br />Desorption and Gold Room (35x80x50) <br />Leach and Absorption Room (35x50x50) <br />Acid Wash Addition (18x18x25) <br />Leach Tanks (8 tanks 38'Dx42') <br />INCO Tank (32x32x36) <br />Process Tank (15'Dx24') <br />Total building volume <br />fi3 <br />54,000 ~ <br />45,000 hl <br />67,`00 n] <br />39,.00 of <br />234,(00 tJ <br />393, ~ 50 ~ <br />225,000 / <br />175.000 / <br />70,(00 / <br />140,000 / <br />87,00 / <br />8,100 / <br />380,€69 / <br />10,368 / <br />2.160 v <br />1,932,447 /?n-~' sn <br />~ Ownership of the adininis[ration, laboratory, workshops/warehouse, warehouse <br />PRELIMINARY DRAFT <br />FOR DISCUSSION PURPOSES ONLY <br />
The URL can be used to link to this page
Your browser does not support the video tag.