My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-09-01_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1999-09-01_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:39 AM
Creation date
11/21/2007 7:07:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
9/1/1999
Doc Name
SURFACE MINE RECLAMATION COST ESTIMATE BATTLE MTN RESOURCES INC SAN LUIS MINE
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />addition, and vehicle maintenance shop buildings have been transfen~ed to the <br />Natural Resource Conservation Service for continued use. This also includes <br />electrical, telephone and water service to the area. <br />Total adjusted building volume <br />1,492, 747 <br />Building demolition cost $0.22/fr3 (1,492,747 fr3) _ $328,404 't/ Ott <br />TOTAL BUILDING DEMOLITION AND DISPOSAL COST ~ --~ <br />REMAINING RECLAMATION COST OBLIGATION $328,404 <br />3,z3~ <br />E.2 Floor and Containment Removal Costs $` <br />All floors are 4 inch thick concrete reinforced with wire mes except the crusher <br />building and screening building which is 5 inch thick concret reinforced with <br />rebar. Four inch floor removal costs are estimated at $3.03/ftZ Five inch floor <br />removal costs are estimated at $S~O~fr` this cost estimate is for 6" thick concrete <br />reinforced with rebar. No Means cost was available for 5" concrete with rebar <br />reinforcement. <br />Structure fi z <br />Administration Building (60x60) 3,600 <br />Laboratories (60x50) 3,000 <br />Workshops/Warehouse (SOx90)~ 4,`00 <br />Warehouse Addition (40x70) 1,050 <br />Vehicle Maintenance Shop (60x130) 7,b00 <br />Grinding Building (50x70) 3,`00 / <br />Filter Building (35x40) 1,400/ <br />Desorption and Gold Room (35x80) 2,800 / <br />Leach and Absorption Room (35x50) 1, i 50 <br />Acid Wash Addition (18x18) .24 / <br />Leach Tanks (175x175) 30,E25 / <br />INCO Tank (32x32) <br />15 <br />P <br />l <br />65 1,C24 <br />475 <br />2 <br />~ <br />x <br />rocess Tan <br />: (1 <br />) , <br />~ <br />Total 4 inch floor area 63,848 <br />~ Ownership of the administration, laboratory, workshops/warehouse, warehouse <br />addition, and vehicle taintenance shop buildings have been transferred to the <br />Natural Resource Conservation Service for continued use. This also includes <br />electrical, telephone and water service [o the area. / <br />Total adjusted 4 inch floor area 43,898 /a/ <br />Concrete removal cost 4" slab = 43,898 fr'` ($3.03/frZ) _ 1 1 / <br />14 t ~ (// <br />PRELIMINARY DRAFT <br />FOR DISCUSSION PURPOSES ONLY <br />
The URL can be used to link to this page
Your browser does not support the video tag.