<br />DAILY REPORT <br /> <br />PROJECT NAME: SAN LUIS MINE PROJECT NUMBER: 92401.00 <br />REPORT DATE: 4/11/97 <br />T0: DAVE HALLMAN, SRK PROJECT ENGINEER <br />FROM: GLENN GUYER, SRK SENIOR FIELD TECHNICIAN <br />SUBJECT: LINER REPAIR AND EQUIPMENT EXTRACTION FROM TAILINGS <br />IMPOUNDMENT. <br />I arrived on site at 0800 hrs. Chuck McMUrry, Field <br />Superintendent, Simbeck and Associates, arrived on site with his <br />equipment to repair the 40-mil VLDPE liner. He brought a~ new roll <br />of 60-mil HDPE liner. The equipment in use was two MC 8000 <br />portable generators, one Columbine Int. Extruder model k:2-SC, <br />equipment no. SA-2EW, one 980-C (CAT) front end loader with bar <br />hoist, one D-SM dozer, one 416 (CAT) back-hoe, one Leister for <br />tack welding, one Leister Variant for tack welding, two grinders, <br />one Columbine test apparatus for sheer and peal tests, two vacuum <br />boxes, one compressor and one vacuum machine. <br />The weather was cold and windy with light snow. The earth moving <br />contractor constructed a tent for the liner contractor to work <br />beneath and furnished heaters to raise the temperature beneath <br />the tent. The surface of the sub-grade, upon which the liner was <br />to be placed, was back drug for smoothness and all oversize rock <br />was removed. I accepted the surface for deployment of HD PE liner <br />at 1200 hrs. <br />Prior to further work (1115 hrs.) I asked Mr. Rob Dorey, <br />Engineer, SRK, for and received permission to deploy the liner <br />horizontally to the existing slopes. <br />At 1230 hrs. the ambient temperature was 28 degree F. with <br />overcast skies, wind from the south at approximately 10 to 15 MPH <br />light snow and a liner temperature of 36 degrees F. The <br />temperature within the tent was 39 degrees F. <br />Trial/pre-welds were completed within the tent confines using <br />HDPE rod on a seam of 40 mil VLDPE and 60 mil I~JPE. Three peal <br />tests were completed with 102 PPI (pounds per inch) with film <br />tear bond, 128 PPI with film tear bond and 107 PPI with non-film <br />tear bond (failing). The sheer test was Film Tear Bond at 206 <br />PPI. The weld appeared inconsistent in smoothness for the length <br />of the weld and appeared to have 'water' bubbles. <br />The Liner contractor stated that he would attempt to get 40 mil <br />HDPE liner and VLDPE welding rod sent to the site. <br />