Laserfiche WebLink
EXHIBIT "L" <br /> ESTIMATED RECLAMATION COSTS <br /> (2nd Revision) <br /> LOCATION "A" <br /> PHASE I - Major Disturbance 6 .0 ac. x $1,100.00 = $ i,600.00 <br /> PHASE II - Stock Pile Reclamation 3.0 ac. x $1,100.00 = $ 3,300.00 <br /> PHASE III - No additional cost if reclamation is complete <br /> on Phase II . Mining can not begin on Phase <br /> III until Phase I is reclaimed and the stock- <br /> pile removed. <br /> TOTAL LOCATION "A" = ,900.00 <br /> LOCATION "B" <br /> Major disturbance and stockpile 4.5 ac. x $1 ,100.00 = $ ,950.00 <br /> Road and Sediment Pond 3.0 ac. x $1,100.00 = $ ,300.00 <br /> TOTAL LOCATION "B" = $ ,250.00 <br /> Total Reclamation Costs Location A & B = $1 ,150.00 <br /> MISC16 <br />