Laserfiche WebLink
Phase IVb Weekly Summary No. 30 Page 4 003-2203 <br />(geotextile, geomembrane, and piping). Leak Detection construction met the requirements of the <br />plans and specifications. <br />Golder observed geomembrane deployment and repairs, documenting ambient air temperature, panel <br />dimensions, thickness, seaming, tie-in overlap, and seam testing (trial seams, pressure, vacuum, and <br />destructive). Geomembrane placed in the Phase IVb OSA met project specifications. <br />Laboratory Tests <br />Golder obtained QA samples of Structural Fill (SFx-O1) and of Soil Liner Fill (SLFb-22). <br />Laboratory index testing was conducted on samples of Structural Fill (SFx-Ol) and Soil Liner Fill <br />(SLFb-22) to verify suitability of materials used. Laboratory test results are presented in Attachment <br />B. <br />Meetin¢s <br />CC&V held Weekly Contractors' meetings on August 19 and 26, 2003. Items discussed included <br />Safety, Environmental, Schedule, and CQA. The next weekly meeting will be held on September 2, <br />2003 at 10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment A. <br />Sincerely, <br />Ron DiDonato <br />Project Resident <br />PAase[W 30 AugusL9-AVgust36, 2003 Golder Associates lnc. <br />