My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-08-27_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-08-27_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:53 PM
Creation date
11/21/2007 6:41:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/27/2003
Doc Name
Weekly Construction
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
es <br />August 20.2003 <br />Golder Associates Inc. <br />44 union Boulevard. Suite 300 <br />Lakewood. CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Project No.: 003-2203 <br />Mr. Ron Roberts RECEIV E® <br />Cripple Creek & Victor Gold Mining Company 7 20Q3 <br />P.O. Box 191 pUG 2 . <br />%755 State Highway 67 <br />Victor. CO 80860 pivision of Minerals and Geology <br />RE: Summary No. 29: August 10 through August 16, 2003 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Deaz Mr. Roberts. <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Nb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of August 10 <br />through August 16, 2003. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 47° F to 54° F, and highs ranged from 75° F to 79° F. Weather <br />observations were made on six days of this seven-day reporting period. <br />Construction S~il0_DSiS <br />Ames Construction Inc. (Ames) of Aurora Colorado is the earthworks contractor for the Phase Nb <br />construction. Ames conducted Phase Nb construction activities on six days of this seven-day reporting <br />period (August 11 through August 16). Poly-Flex conducted Phase Nb construction activities on six <br />days of this seven-day reporting period (August 11 through August 16). <br />Phase Nb <br />Ames continued re-contouring and compaction of subgrade Structural Fill (SF) in preparation for Soil <br />Liner Fill (SLF) placement in the Phase Nb OSA on the south facing slopes of Raven Hill, north of the <br />PSSA. <br />Ames continued excavation of the Phase Nb OSA geomembrane anchor trench at the Phase N b/c tie- <br />in area, excavating approximately 500 linear feet of anchor trench in preparation for geomembtane <br />deployment. <br />Ames placed, and compacted existing Soil Liner Fill (SLF) material into the Phase Nb OSA on the <br />.south slope of Raven Hill (west of the LOB). No SLF was hauled during this reporting .period. <br />
The URL can be used to link to this page
Your browser does not support the video tag.