Laserfiche WebLink
EXHIBIT E -RECLAMATION PLAN <br />AREA D will be reclaimed as an agricultural area consistent with the current status of the land. <br />The side slopes will be regarded at a 3:1 slope, the floor of the excavation will have <br />approximately a 2 percent slope towards the river with 4 inches to 8 inches of topsoil added. <br />This is the same general plan that was used in AREA A to the east. <br />Adequate topsoil for reclamation should be available for the agricultural areas from lands <br />initially stripped prior to the extraction process. If needed, additional topsoil can be obtained <br />from construction projects in the area that have excess fill material. The seed mix and <br />application rates to be used for the reclamation are the same as those currently being used <br />elsewhere on the site. <br />