My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-05-31_REVISION - M1980136
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980136
>
2002-05-31_REVISION - M1980136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:56:58 PM
Creation date
11/21/2007 6:37:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980136
IBM Index Class Name
Revision
Doc Date
5/31/2002
Doc Name
Technical Revision
From
Lafarge West Inc.
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D -MINING PLAN <br />Mining will occur as a year-round operation and will begin on the western end of AREA D and <br />progress in an easterly direction. By beginning mining at the western end of the parcel, we are <br />better able to make more efficient use of our existing facilities and eliminate the need to <br />construct a separate haul road. In addition, this will help to decrease the total disturbed area on <br />the site. <br />Mining will begin with the stripping of topsoil and overburden from the area immediately <br />adjacent to AREA B. The topsoil/overburden stockpiles will be located at the top of the slope on <br />the northern edge of AREA D. We will extract and crush gravel from an open face, as the <br />product is needed, which is the same method as has been used on the site for mining the other <br />areas. Earth moving equipment, crusher/conveyor equipment, and haul trucks will be used to <br />extract, process, and load the material from AREA D. Material stockpiles will be located in the <br />existing mine area. The impacts from extracting and processing the gravel from AREA D will <br />not be any greater or more significant than those currently occurring. Transportation of the <br />material will be through the existing access point at the north end of AREA B along the paved <br />Fairgrounds Road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.