Laserfiche WebLink
1-. <br />EXHIBIT D <br />Mining Plan (Rule 6.4.4) <br />ADDENDUM <br />R~~iv~q <br />SEP ~ ~ 2004 <br />Dhlsfo o7~aerafs ~~logl, <br />Sandco insures that there will be sufficient topsoil salvaged and stockpiled for <br />reclamation at any time during the operation. On the 3-1 backslopes, we estimate it will <br />require approximately 40 cubic feet of topsoil stockpile per IineaI foot of backslope. This <br />topsoil will be temporarily placed on the outer edges of the excavated backslopes-within <br />the permitted boundary-for reclamation. <br />Reclamation topsoil for the "working face" or dry mined azea, which initially runs <br />east and west and then ultimately south to north, will be stockpiled on the west side <br />within the permitted boundary as indicated on the mining plan map. We estimate this <br />volume of topsoil to be approximately 2200 cubic yazds. <br />Reclamation topsoil for the proposed access road will be placed along the north <br />side of the road within the permitted boundary. We estimate this volume to be approx.750 <br />cubic yazds. All topsoil stockpiles will be protected from degradation. <br />