Laserfiche WebLink
EXHIBIT L <br />Reclamation costs (6.4.12) <br />ADDENDUM <br />Rem <br />SFP <br />~~~o ~ar,~o0~ <br />~~e,~~s ~~o~ a <br />In addition to the original cost estimate for reclamation the following shall be inclusive: <br />Grade "working face" of pit: <br />8 hrs 15t bulldozer (a) 90.00 = <br />720.00 <br />Load, transport and place 2200 cubic yazds of topsoil for "working face"= 6600.00 <br />Load, transport and place 550 cubic yazds of topsoil for access road = 2000.00 <br />Seed, mulching and irrigation = 4000.00 <br />7r_o.oo <br />.. 14"% <br />1750 n0 <br />Total 11,470.00 <br />Reclamation for pond area - 6.89 acres <br />Reclamation for access road - .67 acres <br />Total 7.56 acres <br />