Laserfiche WebLink
Corey Pit No. 3 <br />DMG 112 Permit Conversion Application <br />EXHIBTT E -Reclamation Plan <br />e) Reclamation of this site will consist of reducing high-walls to 3:1 (h:v) and maintaining <br />the pit floor at or near final grade as mining progresses. The high-walls will be sloped on <br />the east and west side of the pit as the mining face moves south so that there will be no <br />more than 800 feet of unsloped high-wall present at any one time. Topsoil will be <br />replaced on the finished 3:1 slopes and grass seed planted within two years of final grading <br />in a given area. The entire pit is considered one phase and we do not expect to perform <br />final reclamation until after all gravel reserves have been removed. We expect the life of <br />the mine to be approximately 20 years with the target date of Fall of 2023 for completion <br />of mining activities <br />f) (i) Final grading will leave pit walls sloping at no steeper than 3:1 (h:v). The pit floor will <br />be graded to slope gently (1%) to the north and west. <br />(ii) The original reclamation plan calls for reseeding with Pubescent Wheatgrass at 5.6 <br />ibs. per acre, Smooth Brome at 3.91bs. per acre, and Orchard Grass at 1.21bs. per acre <br />drilled. We prefer a more varied dry land pasture mix that is locally avaitabte for $2.00 <br />per pound. The seed will be drilled into the soil, at the rate indicated below, between <br />October 25 and Apri130, after replacement of topsoil on reclaimed areas. <br />Proposed seed mix <br />Species % of mix Drilled Ibs/ac <br />Lincoln Smooth Brome 18.32 2.10 <br />Hycrest Wheatgrass 14.72 1.69 <br />Tetraploid Perennial Ryegrass 14.93 1.71 <br />Paiute Orchardgrass 14.07 1.61 <br />Oahe Intermediate Wheatgrass 14.49 1.66 <br />Revenue Slender Wheatgrass 9.82 1.13 <br />Sodar Streambank Wheatgrass 9.88 11^13 <br />Total 11.03 <br />(iii) Fertilization will be done in the second year after seeding. Appropriate fertilizer <br />and application rate will be determined by soil test prior to application. <br />(iv) There will be no trees or shrubs planted with this reclamation plan. <br />(v) Topsoil will be replaced with a range of 6 to 12 inches. <br />