My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-08-11_REVISION - M1977424
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977424
>
2005-08-11_REVISION - M1977424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:03 PM
Creation date
11/21/2007 6:35:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977424
IBM Index Class Name
Revision
Doc Date
8/11/2005
Doc Name
soil amendment reclamation
From
Western Water & Land Inc
To
dmg
Type & Sequence
TR7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Logan Wash Mine TR No. 7 <br />Reclamation of the mine benches will begin with regrading and recontouring of the bench <br />surfaces. Regrading and recontouring will be limited to eliminating any sharp topographic <br />features on the bench and blending such features with surrounding bench grade. Regrading does <br />not include pulling back dump outslopes. Regrading will include final construction of storm <br />water control channels as described in Technical Revision No. 5. Bench areas that have well- <br />established native vegetation will not be regraded. Once final grade is established, the surface of <br />the bench other than the storm water channels will be scarified (ripped) to a depth of no less than <br />1 foot to reduce surface compaction. Topsoil or subsoils will then be placed on the scarified <br />surfaces to minimum thickness of 6-inches. The soil surface will be seeded with a range drill <br />using the approved seed mix for the mine (Attachment B). Fertilizer will be applied at a rate of <br />200 pounds per acre with the seed or before final disking of the surface. A balanced 18-18-18 <br />nitrogen, phosphorus, potassium fertilizer will be used. Certified weed-free straw mulch will be <br />applied at rate of 2,000 pounds per acre and crimped into the surface following seeding using a <br />mechanical disc technique (tractor with disc). Straw mulch will be applied manually or by a <br />mechanical spreader, whichever is most feasible. <br />The materials to be applied to the bench surfaces include those in the following table. <br />Bench Reclamation Materials <br /> <br />Material Application Rate <br />lbs er acre <br />Seed mix (Attachment B) 17.5 <br />Straw mulch 2,000 <br />Fertilizer (18-18-18 N-P-K) 200 <br />Western Water 8 Land,lnc. 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.