FE?-tI-OS 'i:06 FROI,I--Colorado Civision of Minaralc d Gaol~¢r f130366635fii T-655 P 009/CI1 F-526 <br />Ri-2000-Ot6, Lafarge West, Inc.: Riverbend Operanon, AM-Ot February 11, 2005 <br />Adequacy Memo Page 4 <br />prior to dewatering. Given this infortnalion, the applicant must demonstrate that the <br />proposed mitigation plans could work. <br />t9. The Groundwater Elevation Graphs in Appendix B of the "Groundwater Monitoring Plan" <br />separate irrigation season and non-irrigation season groundwater elevations versus date <br />onto separate plots- How were irrigation versus non-irrigation seasons determined? <br />How will it be determined for future data collection? The Division would find the <br />graphical presentation of these data more useful if the plots were overlaid as two series <br />on one graph or integrated. The Division requests the applicant respond to these <br />inquiries and also submit revised graphs. <br />Water Balance (P. 28 of 81) <br />20. "Operational Losses, Table 3' needs to specify what years these depletions occur, or <br />corresponding phases of the operation, including reclamation. Water projected to be <br />consumed by the concrete batch plant, for mitigation purposes, or other uses must be <br />included. The applicant needs to clarify how "Water Balance" is defined and calculated <br />in this table. <br />27. The applicant must comply with Rule 6.4.7(4), which states that they "shall indicate the <br />projected amount from each of the sources of water to supply the project water <br />requirements for the mining operation and reclamation." <br />Water Rights/SWSPs <br />22. The SWSP approval letter dated April 2, 2001, submitted with the application for the Fort <br />Lupton Gravel Pit (M-1985-088) portion of the amended permit area, expired on March <br />31, 2003. The applicant must demonstrate current compliance with OSE requirements <br />for this exposed ground water surface. <br />23. The applicant must submit a copy of the We{I Permit for the currently permitted <br />Riverbend Operation to demonstrate current complains with OSE requirements. <br />CDPS Permit <br />24. The applicant should note that the flow rates from the two discharge points in the current <br />CDPS Permit authorization (COG-500416) are limited to 1,000 GPM each (1.44 MGD). <br />Slormwater Management Plan ("SWMP'~ <br />25. In Section 4 -Table A, there appears to be a discrepancy between the Key and the table <br />as Table A indicates that a storage method for topsoil, overburden, sand and gravel, and <br />recyclable concrete stockpiles is " 'I,' enclosed areas' and a management practice for <br />diesel fuel tanks, lubricating fluids, and concrete additives is "L,' stockpile revegetation" <br />The applicant needs to address these discrepancies. The Division assumes that the <br />diesel fuel tanks, etc. will be placed on impervious surfaces and requests that the <br />applicant describe the makeup of the "impervious surface.' <br />25. Section 7. Preventive Maintenance, the applicant should specify an inspection frequency <br />for all facilities listed, rather than "as-needed." <br />27. The statements describing the implementation and applicability of the practices in <br />Section 9: Best Management Practices are listed as options. Please indicate which <br />one(s) will actually be used on site and where so the Division can calculate the <br />applicable bond amount for removal and/or reclamaticn of such structures. <br />