Laserfiche WebLink
• ~ i <br />RECLAMATION COST SUMMARY cont'tl Sheet 3 Of 4 <br />H. EAR THNORK - STREAM CHANNEL RECONSTRUCTION <br />cask No.l Task Description I Cost (5) <br />__-_____ I __________________________________________________ I ___-_-___-__ <br />I <br />I ~ <br />I I <br />~ I <br />Subtotal (H ): <br />____________ <br />I. EARTH40RK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.l Task Description I Cost (E) <br />--------I--------------------------------------------------I------------ <br />I I <br />I I <br />J. EAR TH40RK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.l Task Description <br />Replace copsoiL at test mine facility <br />1 •:~ <br />Subtotal (I ): <br />I Cost (E) <br />._______I__-__-__-___ <br />I 512,096 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Subtotal (J ): 512,096 <br />