Laserfiche WebLink
EXHIBIT "D" <br />MINING PLAN INFORMATION <br />(a) description of the methods of mining in each stage of <br />operation as related to surface disturbances: <br />Mining methods will be consistent throughout the life ofi this <br />operation. The soils consist of Cascajo and Kim-Cascajo com- <br />plex makeup. These are rocky soils with even the surface <br />suitable for aggregates. Since this site will be reclaimed <br />for industrial use, it will not be necessary to save any top- <br />soil or growth media for reclamation. Aggregate will be <br />removed and stockpiled for crushing and screening by <br />front-end loaders. Processed material will be stockpiled on <br />the pit floor for jobs in the area. A 25" setback will be <br />maintained from the north fence in Section 20 and the west <br />boundary as well as the portion of the east boundary that <br />does not daylight. <br />(b) earthmoving <br />The earthmoving equipment used on the site will consist- of <br />front-end wheeled loaders, self-propelled scrapers, dozers, <br />or any combination thereof. <br />(c) water diversions and impoundments. <br />There will be no water diversions or impoundments on site, <br />since no water is proposed for this operation at this time. <br />The operator has Water Quality Control Division Stormwater <br />Discharge Permit No. COG 500753, which will be revised to <br />cover the expanded area under this permit, <br />(d) size of the area to be worked at any one time. <br />A maximum of 35A will be disturbed at any one time, and will <br />consist of a combination of mining, processing, stockpiling <br />and reclamation. <br />(e1 an approximate timetable to describe the mining op- <br />eration and the relationship between mining and reclamation. <br />