My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-05-12_REVISION - M1977347
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977347
>
2004-05-12_REVISION - M1977347
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:52:07 PM
Creation date
11/21/2007 6:24:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977347
IBM Index Class Name
Revision
Doc Date
5/12/2004
Doc Name
Stipulations to the Permit
From
DMG
To
Holcim (US) Inc.
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i~~ iii~iiiui~atti <br />STATE OF COLORADO <br />DIVISfON OF MINERALS AND GEOLOGY <br />Deyanmem al Natural Resources <br />131 J Sherman 51., Room 21 S <br />Denver, Colorado 80103 <br />Ghonc 1]03186[.3567 <br />FA%:0031832.8106 <br />May 3, 1994 <br />Roy ROmr <br />Paul Thomsen crneram <br />Holnam, Inc. %`"~''"" <br />P.O. BO% 2227 f,erwreDocrror <br />Ft Collins, CO 80522 a~~onM <br />Re: Slab Canyon Quarry, Revision Approval, Permit No. M-77-347, Revision <br />No. AM-001 <br />Dear Mr.ihomsen: <br />On Aprii 26, 1994 the Colorado Mined Land Reclamation Board conditionally <br />approved the amendment appiication submitted to the Division on May 2E, 1993, <br />addressing the increase in acreage and changes to the reclamation plan. The <br />terms of the Amendment No. 001 approved by the Board are hereby incorporated <br />into Permit No. M-77-347. <br />The conditions of the Board approval are noted below. Please note that alt <br />other provisions of Permit No. M-77-347 remain in full .force and effect. <br />/ Stipulation No. 01 <br />INSTALL AT LEAST ONE DEMONSTRATION TREE PAD ON THE EXISTING PERMIT <br />BEFORE PHASES II OR III ARE DISTURBED. THE TREE PAD WILL BE IN'iTALLED, <br />TOPSOILED, AND PLANTED NO LATER THAN JULY 31, 1994 ANO BE NO LE'iS THAN <br />16 FEET BY 80 FEET (OR EQUIVALENT AREA). <br />THE BOARD DIRECTED THE DIVISION TO WORK WITH THE OPERATOR TO SELECT THE <br />MOST APPROPRIATE LOCATION FOR THE DEMONSTRATION TREE PAD, AND TI) <br />DESIGNATE A LOCATION IF A CONSENSUS NAS N07 ACHIEVED. <br />Stipulation No. 02 <br />TOPSOIL AND SANDY OVERBURDEN STOCKPILE AREAS WILL BE DESIGNATED ON THE <br />MINING PLAN MAP, EXHIBIT C, BEFORE ANY PART OF PHASES 2 AND 3 AFtE <br />DISTURBED. SUCH DESIGNATION MUST BE IN THE FORMAT OF A REVISIOPI TO THE <br />PERMIT. <br />Stipulation No. 03 <br />THE SPECIFIC AMOUNTS Of GROWTH MEDIUM NECESSARY TO COMPLETE RECLAMATION <br />OF PHASE I WILL BE SUBMITTED TO THE DIVISION NO LATER THAN <br />MAY 31, 1994. THIS MATERIAL HILL EITHER BE STOCKPILED ON-SITE LNTIL IT <br />IS USED FOR RECLAMATION ACTIVITIES OR THE OPERA70R CAN POST THE <br />NECESSARY BOND FOR HAULING SUFFICIENT MATERIAL IN FROM OFF-SITE. <br />STOCKPILING GROWTH MEDIUM OR POSTING SUFFICIENT BOND MUST OCCUR ON OR <br />BEFORE JULY 15, 1944. <br />
The URL can be used to link to this page
Your browser does not support the video tag.