My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-03-19_REVISION - M1997026
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997026
>
2003-03-19_REVISION - M1997026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:43 AM
Creation date
11/21/2007 6:22:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997026
IBM Index Class Name
Revision
Doc Date
3/19/2003
Doc Name
Financial Warranty Increase
From
DMG
To
B & B Excavating Inc
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATI( <br />Task # : 04a <br />Date : 03/19/2003 <br />User : GRM <br />Agency or organization name :DMG <br />Permit or other job action :final reclamation costs update - 2003 <br />Task description :rip and final grade 29 acres for reseeding <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 14H <br />Attachmentno.l:NA <br />Attachment no. 2 :Multi-shank <br />Cost Breakdown <br /> Utilization <br />Ownershipcost/hour : $39.90 NA <br />Grader operating cost/hour : $39.94 100 <br />Ripper operating cost/hour : $2.03 50 <br />Operator cost/hour : $24.92 NA <br />Total unit cosUhour : $106.78 Total fleet cosf/hour <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 29.00 acres <br />Source of estimated acreage :approved max disturbance <br />HOURLY PRODUCTION <br />Seceded application :Ripping (0-3 mph) <br />Average grader speed : 1.50 mph <br />Selected blade angle : NA degrees' <br />Effective blade length : NA feet <br />Width of blade overlap per pass : NA feet <br />Nel grading or ripping width per pass : 8.50 feet " <br />Unadjusted hourly unit production : 1.5455 acres/hour <br />Job Condition Correction Factors <br />Average site altitude : 6,375 feet <br />Permitlob # : M-1997-026 <br />Abbreviation :none <br />Filename :M026-04a <br />' at 0 degrees, blatle is peryendicular <br />to direcgon of travel. <br />^ width of ripper beam on ripping applications <br />$106.78 <br />Source <br />Altitude adjustment factor : 1.00 (Cat HB) <br />Job effciency adjustment factor : 0.85 (1sh/d, mod.) <br />Netjob correction : 0.8500 multiplier <br />Adjusted hourly unit production : 1.3136 acres/hour <br />Adjusted hourly fleet production : 1.3136 acres/hour <br />I.-- - __ ._ _ ... .. <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time <br />Unit cost : $81.29 per acre Total job cost <br />_. <br />CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />State :Colorado <br />County :Eagle <br />Site :Carol Ann Pit <br />Horsepower: 215 <br />Shift basis : 1 perday <br />22.08 hours <br />$2,357 <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.