Laserfiche WebLink
Task # <br />Date <br />User <br />03a State :Colorado Pertnit(ob # : M-1997-028 <br />03x192003 County :Eagle Abbreviation :none <br />GRM Site :Carol Ann Pit Filename : M026-03a <br />Permit or other job action :final reclamation costs update -2003 <br />Task description :IeplaCe tOpS0/l OV6I 12.4 aCreS <br />HOURLY EQUIPMENT COST <br />Model :Cat 633E Series 2 <br />Shift basis : 1 per day <br />Cost Breakdown : Job utilization °k Horsepower : 490 <br />Ownership cosUhour : $72.62 NA Weight (UST) : 56.34 <br />Operating wsUhour : $107.10 100 Cost data source : (CRG) <br />Operator wsUhour : $25.43 NA <br />Total unit cesUhour : $205.15 Total fleet wsUhour : $205.15 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 11,670 LCY factor : NA volume : 11,870 LCY <br />Source of quantity takeoff : accepted volumes from original permit approval <br />Source of estimated swell factor : NA <br />.. r_- .-, ~. s: ~ ~ ,~,: -:~._ . <br />HOURLY PRODUCTION <br />Hauling Caoacily <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight : 1,600 poundslLCY Struck volume : 23.20 LCY <br />Material description : Heaped volume : 34.00 LCY <br />Top Soil Average volume : 28.60 LCY <br />Rated payload : 82,000 pounds <br />Payload capacity : 51.25 LCY Adjusted capacity : 28.80 LCY °' <br />Cvcle Time (load + haul + soread + retuml : Loading time : 0.90 minutes' <br /> Maneuver and spreading time : 0.70 minutes <br />Travel time : • loading time per pair an push-pu~~ moda~a <br />Route Distance (feet) Grade (°/a) Roll. res.(h) Total res.(°/a) Velocity (fpm) Travel time (min.) <br />Haul: 650 2.0 5.0 7.0 977 0.67 minutes" <br />Retum: 650 -2.0 5.0 3.0 2,999 0.22 minutes" <br />'• travel time adjusted for acceleration and deceleration et load and dump Paints <br />velouties ere max. attainable per total resistance shovm, not average Total cycle time 2.48 minutes <br />Job Condkion Correction Factors <br />Site altitude (feet) : 6,375 Adiusted Houdv Production <br />Altitude adjustment factor : 0.96 (Cat HB) Unadjusted unit production : 691.37 LCY/Hour"' <br />Job efficiency factor : 0.83 (1 shiWday) Adjusted unit production : 550.88 LCY/Hour <br /> Adjusted fleet production : 550.88 LCY/Hour <br />Net job correction factor : 0.80 ^ z amen vaWme an p,eroP~,n models <br />JOB TIME AND COST <br />Fleet size : 1 Scraper(s) Total job time : 21.18 Hours <br />Unit cost : <br />- <br />~ <br />. $0.372 ILCY <br />._ Total job cost : <br />.~ _ $4 348 <br />, <br />_, ; <br />1 <br />. <br />t _ ..- , <br />.,._. . _ .... . . . . . <br />CIRCES Cost Estimation Software <br />SCRAPER -ONLY WORK <br />iNTIFICATION <br />Agency or organization name : DMG <br />